The main idea of the proposal is to build a sustainable transport hub that is environmentally friendly and at the same time fully meets the needs of the region. The emphasis on sensitively integrating the proposal into the landscape reflects this commitment, as does the technically simple design of the terminal at its centre, which has minimal environmental or visual impact on its surroundings. The Kořenice-Bečváry VRT terminal has the potential to become not only a key transport point, but also an inspiring example of contemporary and environmentally responsible architecture that seeks to strike the right balance between technical design and the landscape it intervenes in.

Location Kořenice Bečváry

Client Správa Železnic

Cost 450 mil. Kč

Project Architektonická soutěž (1. místo)

Cooperation Mikoláš Vavřín, HR design

Authors Petr Šuma, Pavel Fajfr, Marek Kociolek, Mikoláš Vavřín

Vizualizations va-vi

Date 06/2025